DocumentCode :
1155329
Title :
Transmission Planning for Mountain Sheep - Pleasant Valley Project [includes discussion]
Author :
Morgan, W.A. ; George, G.R. ; Guse, R.C. ; Hatch, M.F.
Author_Institution :
FELLOW AIEE, The Washington Water Power Company, Spokane, Wash
Volume :
75
Issue :
3
fYear :
1956
Keywords :
Conductors; Costs; Cranes; Inspection; Insulation; Moisture; Power generation; Power generation economics; Power transmission lines; Voltage;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher :
ieee
ISSN :
0097-2460
Type :
jour
DOI :
10.1109/AIEEPAS.1956.4499436
Filename :
4499436
Link To Document :
بازگشت