• DocumentCode
    1156144
  • Title

    Industrial and cogeneration protection problems requiring simulation

  • Author

    Clark, Harrison K. ; Feltes, James W.

  • Author_Institution
    Power Technol. Inc., Roseville, CA, USA
  • Volume
    25
  • Issue
    4
  • fYear
    1989
  • Firstpage
    766
  • Lastpage
    775
  • Abstract
    The procedures outlined in relay instruction manuals for setting out-of-step, loss-of-excitation, reverse power, external fault, and similar protective relays cover typical situations and may not be appropriate in all circumstances. Cogenerators, small power producers, and industrial generators can face long fault clearing times, high fault levels, lower fault levels, high voltage, and a range of other unusual conditions in the adjoining utility system. Some critical relay applications and the simulations required to select the best settings are outlined for use in such cases. The discussion covers out-of-step protection; loss-of-excitation protection; reverse power protection; overcurrent protection; shaft torques from utility reclosing; load shedding; and self-excitation overvoltages
  • Keywords
    cogeneration; overcurrent protection; overvoltage; relay protection; cogeneration protection; high fault levels; high voltage; industrial generators; load shedding; long fault clearing times; loss-of-excitation protection; lower fault levels; out-of-step protection; overcurrent protection; relay applications; reverse power protection; self-excitation overvoltages; shaft torques; small power producers; utility reclosing; Circuit faults; Cogeneration; Industrial plants; Industry Applications Society; Power generation; Power system protection; Power system relaying; Protective relaying; Shafts; Voltage;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/28.31259
  • Filename
    31259