DocumentCode :
1160929
Title :
Optimal Hydrothermal Scheduling with Cascaded Plants Using Progressive Optimality Algorithm
Author :
Nanda, J. ; Bijwe, P.R.
Author_Institution :
Department of Electrical Engineering Indian Institute of Technology
Issue :
4
fYear :
1981
fDate :
4/1/1981 12:00:00 AM
Firstpage :
2093
Lastpage :
2099
Abstract :
This paper presents an application of the ´Progressive Optimality Algorithm´ (POA) to the problem of short range optimal hydrothermal scheduling in a power system consisting of ca. caded plants with time delay. Head variation and constraints imposed due to equipment ratings and operating conditions on hydro as well as thermal-electric subsystems have been considered. Electrical subsystem has been represented in detail through ac power flows. Resulbs for a sample 5 bus system consisting of two hydro (cascaded) and two thermal stations clearly reveal the simplicity, effectiveness and distinct superiority of the progressive optamility algorithm over many of the existing techniques. The algorithm requires minimal storage and is extremely fast. It is envisaged thst POA technique would greatly appeal to the utility engineers for practical application.
Keywords :
Costs; Hydroelectric-thermal power generation; Load flow; Power generation; Reactive power; Reservoirs; Scheduling algorithm; Thermal factors; Thermal loading; Voltage;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1981.316486
Filename :
4110834
Link To Document :
بازگشت