DocumentCode :
1160943
Title :
Line and shunt switching to alleviate overloads and voltage violations in power networks
Author :
Muller, N. ; Quintana, V.H.
Author_Institution :
Dept. of Electr. Eng., Waterloo Univ., Ont., Canada
Volume :
136
Issue :
4
fYear :
1989
fDate :
7/1/1989 12:00:00 AM
Firstpage :
246
Lastpage :
253
Abstract :
The authors present an algorithm to alleviate power system emergency conditions by network topology rescheduling. The technique, based on sensitivity analysis, makes use of some practical simplifications. The switching of shunt elements is determined from the changes on the reactive power injections that are necessary to alleviate voltage violations. A relieving line switching sequence is determined by selecting and ranking possible switchable branches according to effectiveness in alleviating overloads and/or voltage violations. The algorithm is simulated on 24 and 118-busbar systems
Keywords :
overvoltage; power systems; switching; transmission networks; network topology rescheduling; power system emergency condition alleviation; reactive power injections; relieving line switching sequence; sensitivity analysis; shunt switching; voltage violations;
fLanguage :
English
Journal_Title :
Generation, Transmission and Distribution, IEE Proceedings C
Publisher :
iet
ISSN :
0143-7046
Type :
jour
Filename :
31378
Link To Document :
بازگشت