• DocumentCode
    1161505
  • Title

    Auxiliary Power for Eddystone Station

  • Author

    Adams, J.A.

  • Volume
    77
  • Issue
    3
  • fYear
    1958
  • fDate
    4/1/1958 12:00:00 AM
  • Firstpage
    1324
  • Lastpage
    1328
  • Abstract
    For Eddystone Station there is a separate auxiliary power system for each main unit to supply the unit with essential auxiliaries and a station auxiliary power system to supply common plant equipment, station services, and starting requirements. Each of these systems is a radial system with 4-kv ties between systems only for starting and emergency supply. Reliability has been built into the auxiliary power supply by maintaining simplicity of design, the omission of complicated automatic throwover schemes, and the use of modern equipment of adequate capacity.
  • Keywords
    Boilers; Feeds; Joining processes; Machine tools; Power engineering and energy; Power engineering computing; Power systems; Program processors; Programming profession; Temperature;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
  • Publisher
    ieee
  • ISSN
    0097-2460
  • Type

    jour

  • DOI
    10.1109/AIEEPAS.1958.4500150
  • Filename
    4500150