DocumentCode :
1161505
Title :
Auxiliary Power for Eddystone Station
Author :
Adams, J.A.
Volume :
77
Issue :
3
fYear :
1958
fDate :
4/1/1958 12:00:00 AM
Firstpage :
1324
Lastpage :
1328
Abstract :
For Eddystone Station there is a separate auxiliary power system for each main unit to supply the unit with essential auxiliaries and a station auxiliary power system to supply common plant equipment, station services, and starting requirements. Each of these systems is a radial system with 4-kv ties between systems only for starting and emergency supply. Reliability has been built into the auxiliary power supply by maintaining simplicity of design, the omission of complicated automatic throwover schemes, and the use of modern equipment of adequate capacity.
Keywords :
Boilers; Feeds; Joining processes; Machine tools; Power engineering and energy; Power engineering computing; Power systems; Program processors; Programming profession; Temperature;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher :
ieee
ISSN :
0097-2460
Type :
jour
DOI :
10.1109/AIEEPAS.1958.4500150
Filename :
4500150
Link To Document :
بازگشت