• DocumentCode
    1162222
  • Title

    A Probabilistic Production Costing Methodology for Systems with Storage

  • Author

    Sidenblad, Kathleen M. ; Lee, Stephen T.Y.

  • Author_Institution
    Systems Control, Inc.
  • Issue
    6
  • fYear
    1981
  • fDate
    6/1/1981 12:00:00 AM
  • Firstpage
    3116
  • Lastpage
    3124
  • Abstract
    Using the concept of an Expected Incremental Generation Cost Curve (EIGC), a new probabilistic production cost methodology is presented. This method, somewhat related to the Baleriaux-Booth equivalent load concept, is useful for production costing in both traditional systems and those involving storage. In fact, the probabilistic storage-thermal scheduling problem is shown to reduce to a deterministic scheduling problem easily solved using a linear programming approach.
  • Keywords
    Control systems; Costing; Costs; Dynamic programming; Energy storage; Linear programming; Meeting planning; Power system planning; Processor scheduling; Production systems;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1981.316379
  • Filename
    4110980