• DocumentCode
    1162540
  • Title

    Updating a steel mill power system to improve reliability and decrease energy costs

  • Author

    Albaugh, John R. ; Kornblit, Morris J.

  • Author_Institution
    Wheeling-Pittsburgh Steel Corp., Mingo Junction, OH, USA
  • Volume
    30
  • Issue
    5
  • fYear
    1994
  • Firstpage
    1317
  • Lastpage
    1320
  • Abstract
    The cost of electricity and operating reliability in heavy industry can be key in determining which processes and plants survive in today´s competitive market. This paper provides an insight into the planning and implementation of several significant cost saving and reliability improvements at a turn-of-the-century steel mill in Ohio. A clear understanding of what to look for and how to proceed with such projects should provide motivation for others considering similar improvements
  • Keywords
    economics; energy conservation; metallurgical industries; power system reliability; steel industry; Ohio; cost saving; energy costs reduction; planning; reliability improvements; steel mill power system; Costs; Helium; Metals industry; Milling machines; Power system planning; Power system reliability; Production; Senior members; Steel; Substations;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/28.315245
  • Filename
    315245