DocumentCode :
1163516
Title :
Estimates of Comparative Costs for Uprating Transmission Capacity
Author :
Baldick, Ross ; O´Neill, Richard P.
Author_Institution :
Dept. of Electr. & Comput. Eng., Univ. of Texas at Austin, Austin, TX
Volume :
24
Issue :
2
fYear :
2009
fDate :
4/1/2009 12:00:00 AM
Firstpage :
961
Lastpage :
969
Abstract :
In this paper, we estimate the costs of increasing transmission system capability through technologies for uprating transmission capacity without expanding the transmission footprint. We compare costs for uprating to the costs of new capacity.
Keywords :
flexible AC transmission systems; comparative cost estimation; transmission system capability; uprating transmission capacity; Flexible AC transmission systems (FACTS); transmission assets;
fLanguage :
English
Journal_Title :
Power Delivery, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8977
Type :
jour
DOI :
10.1109/TPWRD.2008.2002990
Filename :
4785119
Link To Document :
بازگشت