DocumentCode :
1166374
Title :
Survey of Cyclic Load Capabilities of Fossil-Steam Generating Units
Author :
Fenton, F.H., Jr.
Author_Institution :
The FPA Corporation
Issue :
6
fYear :
1982
fDate :
6/1/1982 12:00:00 AM
Firstpage :
1410
Lastpage :
1419
Abstract :
The current practice of placing large-size fossil and nuclear steam-generating units into commercial operation will continue unabated for at least the next 10 years. Such units, intended primarily for base-load operation, generally do not have large load-turndown and two-shift cycling capabilities. Consequently, a loss of operating flexibility is slowly being created with potential future problems for power system operation.
Keywords :
Councils; Fuels; Industrial power systems; Meeting planning; Nuclear power generation; Power generation; Power system planning; Power system reliability; Scheduling; US Department of Energy;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1982.317188
Filename :
4111475
Link To Document :
بازگشت