• DocumentCode
    1167422
  • Title

    Distribution Transformer Primary Fuse Coordination

  • Author

    Takach, D.S.

  • Author_Institution
    Westinghouse Electric Corporation
  • Issue
    7
  • fYear
    1982
  • fDate
    7/1/1982 12:00:00 AM
  • Firstpage
    2278
  • Lastpage
    2285
  • Abstract
    Successful application of primary fuses on distribution transformers depends on several factors, one of which is coordination. Proper coordination implies proper sequence of operation of protective devices. Proper sequence of operation depends on consideration of system characteristics, transformer characteristics, and fuse characteristics. This paper reviews each of these characteristics.
  • Keywords
    Circuit faults; Cities and towns; Fault currents; Fuses; Iron; Power & Energy Society; Printing; Protection; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1982.317434
  • Filename
    4111591