• DocumentCode
    1168555
  • Title

    Electrical Features of the Bath County Pumped - Storage Project

  • Author

    Fostiak, R.J. ; Thompson, W.L.

  • Author_Institution
    Harza Engineering Co.
  • Issue
    9
  • fYear
    1982
  • Firstpage
    3166
  • Lastpage
    3172
  • Abstract
    The Bath County Pumped Storage Project is scheduled for full commercial operation on the VEPCO system in October, 1986. This paper describes the significant features of the major electrical equipment. Particular emphasis is placed on the considerations which led to the selection of static, variable-frequency starting of the units as pumps and to the use of a gas-insulated (GIS) 500-kV switchyard.
  • Keywords
    Circuit breakers; Earth; Electrical capacitance tomography; Power engineering and energy; Power generation; Reactive power; Reservoirs; Switches; Tellurium; Water resources;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1982.317530
  • Filename
    4111721