DocumentCode :
1169005
Title :
Electrical - Mechanical Design of the Bonneville Second Powerhouse
Author :
McDonald, D.T. ; Meloy, G.R. ; Nelson, R.E. ; Loney, S.R.
Author_Institution :
US ARMY CORPS OF ENGINEERS HYDROELECTRIC DESIGN BRANCH
Issue :
9
fYear :
1982
Firstpage :
3585
Lastpage :
3591
Abstract :
Development of upstream storage in the existing Columbia River basin made it economically attractive to add a second powerhouse to the existing Bonneville Project. The design problem concerned integrating the new powerhouse into a 40 year old project while meeting environmental constraints in river flow and providing for anadromous fish passage. Scope of treatment involves a general discussion of project ectrical and mechanical features with a review of equipment selected and reasons for selection in Certain cases. The resulting discussion provides information on the design of a large low head hydroelectric powerhouse which began commerical operation in 1981
Keywords :
Centralized control; Design engineering; IEEE members; Navigation; Power engineering and energy; Power generation; Power generation economics; Power system economics; Rivers; Strontium;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1982.317566
Filename :
4111775
Link To Document :
بازگشت