Nuclear Unit Construction/Fuel-Loading Duration
Author :
Yamayee, Zia A. ; Anderson, David V.
Author_Institution :
Pacific Northwest Utilities Conference Committee
Issue :
12
fYear :
1983
Firstpage :
3736
Lastpage :
3743
Abstract :
Lead time (license, construction, fuel- load) for nuclear units is an important factor in planning for resources to meet future loads. The average lead time estimate has increased by 20 months between 1977 and 1982. Analysis of actual versus estimated lead time shows considerable uncertainty in the estimated lead time.
Keywords :
Data analysis; Density functional theory; Inductors; Licenses; Meeting planning; Nuclear power generation; Power engineering; Power generation; Samarium; Uncertainty;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1983.317866
Filename :
4111896
Link To Document :
بازگشت