DocumentCode :
1170829
Title :
Hydrothermal Economic Scheduling Part IV. A Continuous Procedure for Maximizing the Weighted Output of a Hydroelectric Generating Station
Author :
Bernholtz, B. ; Graham, L.J.
Volume :
80
Issue :
3
fYear :
1961
fDate :
4/1/1961 12:00:00 AM
Firstpage :
1105
Lastpage :
1107
Abstract :
The derivative of the function relating maximum station output to station discharge is discontinuous at certain points. The attendant difficulties in maximizing weighted hydro output were avoided in Part I by using a maximizing procedure based on tabulated values of output and discharge. Here an alternative procedure is presented. Maximum station output is approximated by a concave differential function of discharge. In maximizing weighted hydro output, the derivative plays an essential role and any physically possible discharge is permitted.
Keywords :
Cost function; Equations; Fuel economy; Hydroelectric power generation; Job shop scheduling; Lagrangian functions; Power generation economics; Power system dynamics; Power system economics; Propagation losses;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher :
ieee
ISSN :
0097-2460
Type :
jour
DOI :
10.1109/AIEEPAS.1961.4501221
Filename :
4501221
Link To Document :
بازگشت