    Load Forecasting on the TVA System Par I-Substation Loads

  • Author

    New, W.R.

  • Volume
    81
  • Issue
    3
  • fYear
    1962
  • fDate
    4/1/1962 12:00:00 AM
  • Firstpage
    101
  • Lastpage
    105
  • Abstract
    Efficient planning and design of the transmission system depends upon reasonably accurate forecastss of the loads it will serve. Substation load forecasts are prepared by the Tennessee Valley Authority (TVA) 15 years in advance. For the first 5 years, preliminary forecasts are prepared by months using time series analysis, carefully collected information, and judgment. Loads for another 10 years are extended largely on the basis of judgment. These preliminary forecasts are subjected to three critical reviews resulting in necessary modifications. The sum of adjacent substation loads is compared with larger area forecasts.
  • Keywords
    Business; Cultural differences; Economic forecasting; Load forecasting; Marketing and sales; Power generation economics; Power system economics; Power system planning; Substations; Weather forecasting;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
  • Publisher
    ieee
  • ISSN
    0097-2460
  • Type

    jour

  • DOI
    10.1109/AIEEPAS.1962.4501275
  • Filename
    4501275