Abstract
Efficient planning and design of the transmission system depends upon reasonably accurate forecastss of the loads it will serve. Substation load forecasts are prepared by the Tennessee Valley Authority (TVA) 15 years in advance. For the first 5 years, preliminary forecasts are prepared by months using time series analysis, carefully collected information, and judgment. Loads for another 10 years are extended largely on the basis of judgment. These preliminary forecasts are subjected to three critical reviews resulting in necessary modifications. The sum of adjacent substation loads is compared with larger area forecasts.
Keywords
Business; Cultural differences; Economic forecasting; Load forecasting; Marketing and sales; Power generation economics; Power system economics; Power system planning; Substations; Weather forecasting;
fLanguage
English
Journal_Title
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher
ieee
ISSN
0097-2460
Type
jour
DOI
10.1109/AIEEPAS.1962.4501275
Filename
4501275
Link To Document