• DocumentCode
    1171437
  • Title

    Modern Control of Large Hydroelectric Generating Stations

  • Author

    Bruck, R.H.

  • Volume
    81
  • Issue
    3
  • fYear
    1962
  • fDate
    4/1/1962 12:00:00 AM
  • Firstpage
    146
  • Lastpage
    152
  • Abstract
    A brief description is given of the evolution of control of large hydroelectric stations up to the present time, and also plans for control of future plants, including the John Day and Lowver Monumental plants now under construction. The design for new stations provides the same control in the powerhouse control room that would be provided at a remotecontrol station, and also is compatible, with a minimum of modification, with remote control from a central computer.
  • Keywords
    Hydroelectric power generation; Integrated circuit interconnections; Intelligent networks; Laboratories; Performance analysis; Phase measurement; Power system interconnection; Power transmission lines; Transformers; Transient analysis;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
  • Publisher
    ieee
  • ISSN
    0097-2460
  • Type

    jour

  • DOI
    10.1109/AIEEPAS.1962.4501287
  • Filename
    4501287