• DocumentCode
    1171825
  • Title

    The Availability Improvement Methodology (AIM) for Evaluating Power Plant Improvement Projects

  • Author

    Richard, Clyde C. ; Nelson, Martin E. ; Singh, Harinder

  • Author_Institution
    U. S. Naval Academy and Senior Associates, Trident Engineering Associates, Inc.
  • Issue
    6
  • fYear
    1983
  • fDate
    6/1/1983 12:00:00 AM
  • Firstpage
    1543
  • Lastpage
    1551
  • Abstract
    The Availability Improvement Methodology (AIM) presented in this paper describes a method for calculating the increase in the power plant equivalent availability factor resulting from a proposed improvement project. AIM uses the recently developed IEEE definitions, along with other reliability parameters for establishing unit availability and performance. Additionally, AIM calculations are based primarily on data being collected for the Generating Availability Data System (GADS) of the National Electric Reliability Council. Many utilities are presently collecting equipment outage data on the GADS Performance and Event Report Forms. This data, if properly developed, is sufficient for performing AIM calculations.
  • Keywords
    Availability; Councils; Data systems; Equations; Magnetic resonance imaging; Power engineering and energy; Power generation; Power system reliability; Production; Productivity;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1983.317882
  • Filename
    4112108