DocumentCode :
1171932
Title :
The Operating Experiences and Performance Characteristics During the First Year of Operation of the Crotched MT. New Hampshire Windfarm
Author :
Symanski, P.
Author_Institution :
NEW ENGLAND POWER SERVICE COMPANY
Issue :
6
fYear :
1983
fDate :
6/1/1983 12:00:00 AM
Firstpage :
1637
Lastpage :
1641
Abstract :
This paper is a summary of the observations and monitoring done during the first year of operation of a windfarm located on Crotched Mt. in Greenfield, New Hampshire. The manufacturer and participating utilities have begun to answer the many questions which until now have only been modeled by computer simulation, discussed in theory or formulated in studies. While this paper does not answer all of the questions on windfarms, it does provide valuable data on the operation and performance of an actual windfarm under a variety of conditions.
Keywords :
Circuits; Computerized monitoring; Energy conversion; Foot; Power generation; Protection; Strontium; Substations; Transformers; Video recording;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1983.317894
Filename :
4112120
Link To Document :
بازگشت