DocumentCode :
1172927
Title :
Power-system control¿the CEGB´s plans
Author :
Pulsford, H.E. ; Gunning, P.F.
Volume :
13
Issue :
7
fYear :
1967
fDate :
7/1/1967 12:00:00 AM
Firstpage :
245
Lastpage :
249
Abstract :
The Central Electricity Generating Board´s 2-tier control system is being reinforced by the installation of ´district´ control rooms and new area control rooms at the existing control centres, and by a new national control centre in London with computer-controlled selective electronic display. The changeover to 3-tier operation will be complete in 1968-69.
Keywords :
digital computers; electrical power systems;
fLanguage :
English
Journal_Title :
Electronics and Power
Publisher :
iet
ISSN :
0013-5127
Type :
jour
DOI :
10.1049/ep.1967.0170
Filename :
5178321
Link To Document :
بازگشت