• DocumentCode
    1173183
  • Title

    Computer Simulation of Semisynchronous Start of Hydroelectric Pumped Storage Units

  • Author

    Gonzalez, Avelino ; Baldwin, M.S. ; Kilgore, L.A. ; Chidamber, Shyam R.

  • Author_Institution
    Westinghouse Electric Corporation Steam Turbine-Generator Division
  • Issue
    8
  • fYear
    1983
  • Firstpage
    2702
  • Lastpage
    2709
  • Abstract
    A novel method for simulating a semisynchronous start of a pumped storage hydroelectric unit is described. It uses a computer program composed of two sections: an induction start and a synchronous acceleration. The results of the synchronous acceleration portion were extended and verified with other existing, more exact programs. The advantage of this program is that it is written for an HP-85 desk-top computer and can therefore be run very inexpensively. Additionally, it could be run in the field during the commissioning of a unit.
  • Keywords
    Acceleration; Computer simulation; Frequency; Induction motors; Power systems; Pumps; Stator windings; Stress; Synchronous motors; Turbines;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1983.317676
  • Filename
    4112268