DocumentCode :
1173183
Title :
Computer Simulation of Semisynchronous Start of Hydroelectric Pumped Storage Units
Author :
Gonzalez, Avelino ; Baldwin, M.S. ; Kilgore, L.A. ; Chidamber, Shyam R.
Author_Institution :
Westinghouse Electric Corporation Steam Turbine-Generator Division
Issue :
8
fYear :
1983
Firstpage :
2702
Lastpage :
2709
Abstract :
A novel method for simulating a semisynchronous start of a pumped storage hydroelectric unit is described. It uses a computer program composed of two sections: an induction start and a synchronous acceleration. The results of the synchronous acceleration portion were extended and verified with other existing, more exact programs. The advantage of this program is that it is written for an HP-85 desk-top computer and can therefore be run very inexpensively. Additionally, it could be run in the field during the commissioning of a unit.
Keywords :
Acceleration; Computer simulation; Frequency; Induction motors; Power systems; Pumps; Stator windings; Stress; Synchronous motors; Turbines;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1983.317676
Filename :
4112268
Link To Document :
بازگشت