DocumentCode :
1173732
Title :
Outline Of The 100 kw Otec Pilot Plant In The Republic Of Naure
Author :
Mitsui, Tsuneo ; Ito, Fumio ; Seya, Yutaka ; Nakamoto, Yasunobu
Author_Institution :
Tokyo Electric Power Co., Inc.
Issue :
9
fYear :
1983
Firstpage :
3167
Lastpage :
3171
Abstract :
A 100 kW OTEC pilot plant was constructed for demonstration purposes in the Republic of Nauru and began, in October 1981, to send electricity to the real power system. The main points of the plan, design and technical considerations are introduced as well as the operation results up to date. This pilot plant operation has proved the validity of the electrical and mechanical design, and the underwater pipeline laying method in the field of ocean-civil engineering.
Keywords :
Indium tin oxide; Ocean temperature; Pipelines; Power generation; Power generation economics; Power systems; Sea surface; Surface topography; System testing; Turbines;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1983.318124
Filename :
4112327
Link To Document :
بازگشت