DocumentCode :
1173923
Title :
Optimal Dispatch of Generating Units of the Itaipu Hydroelectric Plant
Author :
Arce, Alicia
Author_Institution :
Itaipui Binacional, Brazil
Volume :
21
Issue :
11
fYear :
2001
Firstpage :
56
Lastpage :
56
Abstract :
This article is concemed with the optimal dispatch of generating units of Itaipu, the world´s largest hydroelectric plant in operation. Itaipi is a 12.6 GW hydro plant, located on the Parana river in South America, composed of 18 identical 700 MW generating units. A dynamic programming model has been developed to optimize the number of generating units in operation at each hour of the day in order to attain the total generation scheduling of the plant in the most economic way. The model highlights the trade-off between start-up/shut-down of generating units and hydro power efficiency, taking into account variations in tailrace elevation, penstock head losses, and turbine-generator efficiencies. The methodology has been tested for a typical generation scheduling, and the results show that the number of the turbine-generator sets dispatched has a major influence on the overall hydroplant efficiency, and therefore it is a key aspect to be considered in the dispatch of hydro generating units. In the case of Itaipu, the economic benefits, in terms of greater power efficiency with respect to actual operation, are in the range of millions of dollars per year.
Keywords :
EMTDC; Electricity supply industry; Hydroelectric power generation; Job shop scheduling; PSCAD; Power generation economics; Power system dynamics; Power system modeling; Power system reliability; Reactive power;
fLanguage :
English
Journal_Title :
Power Engineering Review, IEEE
Publisher :
ieee
ISSN :
0272-1724
Type :
jour
DOI :
10.1109/MPER.2001.4311147
Filename :
4311147
Link To Document :
بازگشت