Title :
Field Experience with Absolute Time Synchronism Between Remotely Located Fault Recorders and Sequence of Events Recorders
Author :
Burnett, R.O., Jr.
Author_Institution :
Georgia Power Company
fDate :
7/1/1984 12:00:00 AM
Abstract :
This paper addresses the problem of maintaining absolute real time synchronism between many remote substation locations containing fault and sequence of events recording equipment. Several methods are described which have been under field evaluation for over four years and are in current use at Georgia Power Company.
Keywords :
Associate members; Clocks; Frequency synchronization; Magnetic recording; Power system analysis computing; Power system faults; Power system protection; Power system relaying; Stability; Tagging;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/TPAS.1984.318676