    Field Experience with Absolute Time Synchronism Between Remotely Located Fault Recorders and Sequence of Events Recorders

  • Author

    Burnett, R.O., Jr.

  • Author_Institution
    Georgia Power Company
  • Issue
    7
  • fYear
    1984
  • fDate
    7/1/1984 12:00:00 AM
  • Firstpage
    1739
  • Lastpage
    1742
  • Abstract
    This paper addresses the problem of maintaining absolute real time synchronism between many remote substation locations containing fault and sequence of events recording equipment. Several methods are described which have been under field evaluation for over four years and are in current use at Georgia Power Company.
  • Keywords
    Associate members; Clocks; Frequency synchronization; Magnetic recording; Power system analysis computing; Power system faults; Power system protection; Power system relaying; Stability; Tagging;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1984.318676
  • Filename
    4112738