DocumentCode
1177340
Title
Field Experience with Absolute Time Synchronism Between Remotely Located Fault Recorders and Sequence of Events Recorders
Author
Burnett, R.O., Jr.
Author_Institution
Georgia Power Company
Issue
7
fYear
1984
fDate
7/1/1984 12:00:00 AM
Firstpage
1739
Lastpage
1742
Abstract
This paper addresses the problem of maintaining absolute real time synchronism between many remote substation locations containing fault and sequence of events recording equipment. Several methods are described which have been under field evaluation for over four years and are in current use at Georgia Power Company.
Keywords
Associate members; Clocks; Frequency synchronization; Magnetic recording; Power system analysis computing; Power system faults; Power system protection; Power system relaying; Stability; Tagging;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1984.318676
Filename
4112738
Link To Document