DocumentCode :
1177704
Title :
A Flexible Generation Planning Approach Recognizing Long Term Load Growth Uncertainty
Author :
Yamayee, Zia A. ; Hakimmashhadi, Hossein
Author_Institution :
Dept. of Electrical & Computer Eng. Clarkson College of Technology
Issue :
8
fYear :
1984
Firstpage :
1990
Lastpage :
1996
Abstract :
Planning electric energy resources for the future is complicated by uncertainties in future load,-hydro conditions in a predominantly hydro system and uncertainties associated with other resources. Additionally, there are unquantifiable costs and benefits associated with different technologies, e.g., environmental impacts. Political considerations can´t be ignored in the planning decision process.
Keywords :
Costs; Councils; Economic forecasting; Educational institutions; Energy resources; Load forecasting; Power generation economics; Process planning; Technology planning; Uncertainty;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1984.318504
Filename :
4112778
Link To Document :
بازگشت