DocumentCode :
1177896
Title :
A Flexible Unit Maintenance Scheduling Considering Uncertainties
Author :
Leou, R. C.
Author_Institution :
Yung Ta Institute of Technology and Commerce, Ping Tong, Taiwan
Volume :
21
Issue :
8
fYear :
2001
Firstpage :
60
Lastpage :
60
Abstract :
This paper presents a new methodology for maintenance scheduling that takes into account the uncertain constraints of the unit maintenance problem. If the spinning reserve is enough, this model can obtain an optimal solution based on reliability or cost concerned. Since the power development is more difficult than ever before, scheduling the unit maintenance under tight spinning reserve is a difficult task. In such a situation treating various constraints, such as the spinning reserve, duration of maintenance, the maintenance crew, etc., as soft constraints, a fuzzy 0-1 integer programming model is adopted to find the minimum violation solution. In order to verify that this model can be implemented in the real system, a case study of the Taiwan Power System is carried out using the algorithm.
Keywords :
Linear programming; Maintenance; Neural networks; Power system modeling; Power system relaying; Power transformers; Spinning; Substation protection; Uncertainty; Upper bound; 0-1 integer programming; Maintenance scheduling; crisp model; fuzzy model; spinning reserve;
fLanguage :
English
Journal_Title :
Power Engineering Review, IEEE
Publisher :
ieee
ISSN :
0272-1724
Type :
jour
DOI :
10.1109/MPER.2001.4311559
Filename :
4311559
Link To Document :
بازگشت