• DocumentCode
    1178580
  • Title

    Feasibility of a Bilateral Market for Load Following

  • Author

    Nobile, E. ; Bose, Anjan ; Tomsovic, Kevin

  • Author_Institution
    Washington State University, WA
  • Volume
    21
  • Issue
    9
  • fYear
    2001
  • Firstpage
    64
  • Lastpage
    64
  • Abstract
    In the ongoing process to create a competitive electricity market, the problem of ancillary services is assuming a fundamental role. Ancillary services are those services performed by generators, transmission, and control equipment that are necessary to support basic -services and to maintain reliable operations and system security. In this paper, we focus our attention on one of these services, load following, and propose a competitive way to provide this service through bilateral contracts between supplier and customer. In general, we assume that there will be both a competitive market for the provision of load following and an authority responsible for the amount of load following not met by bilateral contracts.
  • Keywords
    Contracts; Electricity supply industry; Europe; Job shop scheduling; Lightning protection; Optimization methods; Organizing; Power generation economics; Power system reliability; Processor scheduling;
  • fLanguage
    English
  • Journal_Title
    Power Engineering Review, IEEE
  • Publisher
    ieee
  • ISSN
    0272-1724
  • Type

    jour

  • DOI
    10.1109/MPER.2001.4311631
  • Filename
    4311631