DocumentCode :
1181390
Title :
Effects of Large Cyclic Six-Pulse Thyristor Loads on a Rural Distribution System: A Case History
Author :
Angell, D.H.
Author_Institution :
Power Engineers, Inc.
Issue :
4
fYear :
1985
fDate :
7/1/1985 12:00:00 AM
Firstpage :
965
Lastpage :
970
Abstract :
This paper describes the impact of a large cyclical mining load employing six-pulse thyristor bridge rectifiers upon a rural distribution system. The thyristor bridge rectifiers are utilized on dc driven excavators in the mine. An analysis of voltage flicker and harmonics on the distribution system is presented with the resulting operating experience. Use of diesel generation is shown as a method of reducing voltage flicker.
Keywords :
Bridge circuits; History; Power industry; Power supplies; Power system harmonics; Rectifiers; Substations; Telephony; Thyristors; Voltage fluctuations;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1985.319098
Filename :
4113179
Link To Document :
بازگشت