• DocumentCode
    1181467
  • Title

    Computer configuration for Ontario Hydro´s new energy management system

  • Author

    Barrie, D. ; Hill, D.S. ; Yuen, A.

  • Author_Institution
    Ontario Hydro, Toronto, Ont., Canada
  • Volume
    4
  • Issue
    3
  • fYear
    1989
  • fDate
    8/1/1989 12:00:00 AM
  • Firstpage
    927
  • Lastpage
    934
  • Abstract
    In 1985, Ontario Hydro decided to build a system control center and install an energy management system (EMS). Because hardware was being installed, it provided an opportunity to review the standards of performance demanded of the EMS and technological advances that could be utilized. As a result of this review, more rigorous reliability requirements were defined and a computer configuration designed to satisfy these requirements. The authors discuss the resulting performance standards, examine alternative architectures, and describe the computer architecture finally chosen for the EMS
  • Keywords
    computer architecture; load management; power system computer control; Canada; Ontario Hydro; computer architecture; energy management system; hardware; load management; performance standards; power system computer control; reliability; Computer architecture; Control systems; Energy management; Power generation; Power system control; Power system management; Power system protection; Power system security; Power system stability; Power systems;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.32581
  • Filename
    32581