DocumentCode
1183112
Title
Dispatch and Unit Commitment Including Commonly Owned Units
Author
Kusic, G.L. ; Putnam, H.A.
Author_Institution
University of Pittsburgh Department of Electrical Engineering
Issue
9
fYear
1985
Firstpage
2408
Lastpage
2412
Abstract
This paper presents an approach to the problem of dispatch and unit commitment of wholly owned and commonly owned units. Operatinag strategies are described and modifications to conventional dispatch and unit commitment programs are examined. Dynamic programming is used as the basic technique to determine an optimum schedule for startup and shutdown of available generating units in addition to unit base generation and production costs.
Keywords
Control systems; Cost function; Dynamic programming; Dynamic scheduling; Fuel economy; Power generation; Power generation economics; Power system dynamics; Power system economics; Production;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1985.318984
Filename
4113401
Link To Document