DocumentCode :
1183518
Title :
Risk evaluation of transmission system operation modes and its application at British Columbia Transmission Corporation
Author :
Li, W. ; Korczynski, J.K.
Author_Institution :
British Columbia Transmission Corp., Vancouver, BC, Canada
Volume :
151
Issue :
5
fYear :
2004
Firstpage :
658
Lastpage :
664
Abstract :
Risk evaluation has been applied in transmission system development planning for years. However, it has not been sufficiently addressed in selecting transmission operation modes. A basic fact is that the risk evaluation for system development planning focuses on long-term system reinforcements but does not simulate operational measures in a short period. Selecting the most reliable transmission operation mode under different conditions requires simulation of operation measures such as load transfers, generation pattern changes, switching actions and temporary network reconfigurations. The paper presents basic concepts and modelling considerations to simulate operation measures. It also addresses two other issues that have to be considered in operation risk evaluation: inclusion of dynamic ratings of circuits and a simulation capability over any time length. Selection of the lowest risk operation mode in the BCTC metro system was used as an example to illustrate the concepts and method presented.
Keywords :
Monte Carlo methods; power transmission planning; power transmission reliability; risk management; British Columbia Transmission Corporation; circuit dynamic ratings; generation pattern changes; load transfers; long-term system reinforcements; risk evaluation; switching actions; temporary network reconfigurations; transmission reliability; transmission system development planning; transmission system operation modes;
fLanguage :
English
Journal_Title :
Generation, Transmission and Distribution, IEE Proceedings-
Publisher :
iet
ISSN :
1350-2360
Type :
jour
DOI :
10.1049/ip-gtd:20040825
Filename :
1367432
Link To Document :
بازگشت