DocumentCode :
1187291
Title :
Self-Scheduling of a Hydro Producer in a Pool-Based Electricity Market
Author :
Conejo, Antonio J. ; Arroyo, Jose M. ; Contreras, Javier ; Villamor, Francisco A.
Author_Institution :
Universidad de Castilla-La Mancha.
Volume :
22
Issue :
9
fYear :
2002
Firstpage :
60
Lastpage :
60
Abstract :
This paper addresses the self-scheduling of a hydro generating company in a pool-based electricity market. This company comprises several cascaded plants along a river basin. The objective is to maximize the profit of the company from selling energy in the day-ahead market. This paper proposes a 0/1 mixed-integer linear programming (LP) model to account, in every plant, for the nonlinear and nonconcave three dimensional relationship between the power produced, the water discharged and the head of the associated reservoir. Additionally, startup costs due mainly to the wear and tear are considered. Finally, different realistic case studies are analyzed in detail.
Keywords :
Arresters; Discrete Fourier transforms; Discrete wavelet transforms; Electricity supply industry; Fourier transforms; Lightning; Power system protection; Power system relaying; Power system transients; Protective relaying; Pool-based electricity market; hydroelectric prouducer; mixed-integer LP;
fLanguage :
English
Journal_Title :
Power Engineering Review, IEEE
Publisher :
ieee
ISSN :
0272-1724
Type :
jour
DOI :
10.1109/MPER.2002.4312596
Filename :
4312596
Link To Document :
بازگشت