Title :
Report on Receiver Installations
Author_Institution :
Office of Chief Engineer, Federal Communications Commission, Washington 25, D.C.
Abstract :
The report deals with that portion of the Commission´s UHF Project that was concerned with the installation of observation receivers at 768 randomly selected locations within 25 miles of the Empire State Building. All of the television signals observed originated at this site.
Keywords :
Area measurement; Cities and towns; Coaxial components; Costs; FCC; Power generation economics; Receiving antennas; TV; UHF antennas; UHF measurements;
Journal_Title :
Broadcast and Television Receivers, IRE Transactions on
DOI :
10.1109/TBTR2.1962.4503238