DocumentCode :
1188300
Title :
Electrical Features of Fairfield Pimped Storage Project, South Carolina Electric and Gas Company
Author :
Biro, P.
Author_Institution :
Gibbs & Hil 1, Inc.
Issue :
5
fYear :
1980
Firstpage :
1752
Lastpage :
1757
Abstract :
South Carolina Electric & Gas Company is currently constructing the 900 MW Virgil C. Summer nuclear plant and has completed the 512 MW Fairfield pumped storage plant on the Broad River north of Columbia, S. C. Construction began on the nuclear station in mid-1973 and on Fairfield in September 1974. The plants will supplement each other in meeting the utility´s load demand.
Keywords :
Concrete; Contracts; Levee; Magnetic heads; Meeting planning; Power generation; Rivers; Structural beams; Turbines; Water storage;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1980.319869
Filename :
4113994
Link To Document :
بازگشت