DocumentCode
1189986
Title
Active rescheduling for automated guided vehicle systems
Author
Interrante, Leslie D. ; Rochowiak, Daniel M.
Author_Institution
Intelligent Syst. Lab., Alabama Univ., Huntsville, AL, USA
Volume
3
Issue
2
fYear
1994
Firstpage
87
Lastpage
100
Abstract
The paper examines the use of knowledge-based techniques to generate a framework for the active rescheduling of an automated guided vehicle system in a manufacturing environment. The authors´ approach to active rescheduling uses `cues´ drawn from events on the shop-floor to trigger rescheduling. Simulation experiments are used to capture knowledge about the shop-floor and various scheduling strategies. An extensible agent architecture is developed to facilitate active rescheduling
Keywords
automatic guided vehicles; knowledge based systems; scheduling; active rescheduling; automated guided vehicle systems; extensible agent architecture; knowledge-based techniques; manufacturing environment; shop-floor;
fLanguage
English
Journal_Title
Intelligent Systems Engineering
Publisher
iet
ISSN
0963-9640
Type
jour
Filename
329613
Link To Document