• DocumentCode
    1189986
  • Title

    Active rescheduling for automated guided vehicle systems

  • Author

    Interrante, Leslie D. ; Rochowiak, Daniel M.

  • Author_Institution
    Intelligent Syst. Lab., Alabama Univ., Huntsville, AL, USA
  • Volume
    3
  • Issue
    2
  • fYear
    1994
  • Firstpage
    87
  • Lastpage
    100
  • Abstract
    The paper examines the use of knowledge-based techniques to generate a framework for the active rescheduling of an automated guided vehicle system in a manufacturing environment. The authors´ approach to active rescheduling uses `cues´ drawn from events on the shop-floor to trigger rescheduling. Simulation experiments are used to capture knowledge about the shop-floor and various scheduling strategies. An extensible agent architecture is developed to facilitate active rescheduling
  • Keywords
    automatic guided vehicles; knowledge based systems; scheduling; active rescheduling; automated guided vehicle systems; extensible agent architecture; knowledge-based techniques; manufacturing environment; shop-floor;
  • fLanguage
    English
  • Journal_Title
    Intelligent Systems Engineering
  • Publisher
    iet
  • ISSN
    0963-9640
  • Type

    jour

  • Filename
    329613