• DocumentCode
    1191234
  • Title

    Overcyrrent Relay Coordination for Double-Ended Industrial Substations

  • Author

    Horcher, George R.

  • Author_Institution
    Fluor Engineers and Constructors, Inc., Irvine, CA 92730.
  • Issue
    6
  • fYear
    1978
  • Firstpage
    471
  • Lastpage
    481
  • Abstract
    Overcurrent coordination details for phase, ground, and reverse current relays as applied to double-ended substations supplying three-wire low-resistance grounded medium-voltage industrial distribution systems with predominantly induction motor loads are discussed. Emphasis is on the National Electric Code (NEC) limitations to the pickup of phase overcurrent protective devices, the phase coordination of the double-ended substation with a normally closed bus tie breaker, and the ground-fault coordination of the four-wire solidly grounded low-voltage double-ended substation.
  • Keywords
    Code standards; Electricity supply industry; Fault currents; Medium voltage; National electric code; Power system relaying; Protective relaying; Relays; Standards development; Substation protection;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/TIA.1978.4503578
  • Filename
    4503578