DocumentCode
1191811
Title
Reliability Considerations in Cement Plant Power Distribution
Author
Alacchi, J.
Author_Institution
Industrial Sales Support Group, Westinghouse Electric Corp., Hillside, NJ.
Issue
2
fYear
1979
fDate
3/1/1979 12:00:00 AM
Firstpage
221
Lastpage
227
Abstract
Cement plant power-distribution system reliability from the design criteria point of view and the protective relaying required to enhance it is described. Failure rates of various types of equipment and an examination of what leads to premature failure are included.
Keywords
Batteries; Cement industry; Electrical equipment industry; Insulators; Power distribution; Power system relaying; Power system reliability; Protective relaying; Surge protection; Switches;
fLanguage
English
Journal_Title
Industry Applications, IEEE Transactions on
Publisher
ieee
ISSN
0093-9994
Type
jour
DOI
10.1109/TIA.1979.4503641
Filename
4503641
Link To Document