• DocumentCode
    1195734
  • Title

    IT requirements for market participant interaction with ISOs/RTOs

  • Author

    Felzien, Dave ; Fesmire, Bob ; Finney, John

  • Author_Institution
    ABB Inc., Raleigh, NC, USA
  • Volume
    18
  • Issue
    2
  • fYear
    2003
  • fDate
    5/1/2003 12:00:00 AM
  • Firstpage
    517
  • Lastpage
    519
  • Abstract
    Restructured energy markets can be understood as falling on a continuum between the extremes of balanced schedule and award-based markets depending on what is required of the market participant (MP). This paper focuses on the IT needs of MPs doing business in competitive markets, regardless of specific market rules. We examine three main areas of functionality: market communications, operations data management, and settlements. The paper suggests the importance of automation and sharing of information between groups within the MP organization, and concludes with a brief discussion of some additional IT capabilities MPs should consider.
  • Keywords
    information technology; power markets; IT requirements; automation; award-based market; balanced schedule market; competitive markets; independent system operators; information sharing; market communications; market participant; market participant interaction; operations data management; regional transmission operators; settlements; specific market rules; Automation; Communication system operations and management; Contracts; ISO; Portfolios; Power generation; Power generation dispatch; Power generation economics; Power generation planning; Scheduling;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2003.810687
  • Filename
    1198280