DocumentCode :
1198301
Title :
A Real-Time Contingency Reserve Scheduling for an Isolated Power System
Author :
Chang-Chien, Le-Ren ; Lin, Yin-Juin ; Wu, Chin-Chung
Author_Institution :
Dept. of Electr. Eng., Nat. Cheng Kung Univ., Tainan
Volume :
56
Issue :
1
fYear :
2007
fDate :
3/1/2007 12:00:00 AM
Firstpage :
139
Lastpage :
147
Abstract :
Utilities use contingency reserves to deal with the contingency events. To ensure that the reliability and operating frequency are well maintained, the reserve scheduling guidelines always specify that the reserve quantity and response rate should meet some precise levels. This paper presents an algorithm to estimate the frequency response characteristic, beta, of an isolated system online. The real-time estimated beta could be gainfully used for the instant when the update of reserve scheduling is needed. A contingency reserve scheduling according to a series of frequency restoration processes is also proposed to ensure the effectiveness of the reserve response. Test results showing that the scheduling method in simulated conditions, and on actual operating data, was confirmed to be feasible to ensure the power system´s reliability
Keywords :
frequency response; power generation scheduling; power system reliability; frequency response characteristic; frequency restoration process; power system reliability; real-time contingency reserve scheduling; Frequency estimation; Frequency response; Guidelines; Maintenance; Power system reliability; Power system restoration; Power system simulation; Power systems; Real time systems; System testing; Contingency reserve; frequency response characteristic; spinning reserve;
fLanguage :
English
Journal_Title :
Reliability, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9529
Type :
jour
DOI :
10.1109/TR.2006.884588
Filename :
4118422
Link To Document :
بازگشت