DocumentCode :
1202122
Title :
Integrated scheduling of flexible manufacturing systems employing automated guided vehicles
Author :
Lee, Doo Yong ; DiCesare, Frank
Author_Institution :
Dept. of Precision Eng. & Mechatronics, Korea Adv. Inst. of Sci. & Technol., Taejon, South Korea
Volume :
41
Issue :
6
fYear :
1994
fDate :
12/1/1994 12:00:00 AM
Firstpage :
602
Lastpage :
610
Abstract :
Centralized and distributed automated guided vehicle system (AGVS) models for materials handling, and the model for part processing are integrated into a single coherent model. This formulation can be used to collectively schedule and control the entire flexible manufacturing system (FMS) as opposed to the traditional separate scheduling of part processing and material handling. The two AGVS models are based on Petri nets and can be directly used in the scheduling method that uses Petri nets for formulation and heuristic search for solution. This method employs a global search to seek the optimal operation of an entire FMS. Scheduling examples are presented and the method compares favorably with the results simulated using heuristic dispatch rules
Keywords :
Petri nets; automatic guided vehicles; centralised control; control system analysis; control system synthesis; distributed control; flexible manufacturing systems; heuristic programming; materials handling; optimal control; production control; search problems; AGV; FMS; automated guided vehicles; centralized control; distributed control; flexible manufacturing systems; formulation; global search; heuristic dispatch rules; heuristic search; integrated scheduling; optimal operation; part processing; simulation; solution; Automatic control; Control systems; Dispatching; Flexible manufacturing systems; Job shop scheduling; Materials handling; Modeling; Petri nets; Routing; Vehicles;
fLanguage :
English
Journal_Title :
Industrial Electronics, IEEE Transactions on
Publisher :
ieee
ISSN :
0278-0046
Type :
jour
DOI :
10.1109/41.334577
Filename :
334577
Link To Document :
بازگشت