• DocumentCode
    120292
  • Title

    A Bi-level Programming to Two-Stage Transportation Planning Problem

  • Author

    Cuiying Feng ; Ling Nie

  • Author_Institution
    Uncertainty Decision-Making Lab. Bus. Sch., Sichuan Univ., Chengdu, China
  • fYear
    2014
  • fDate
    4-6 July 2014
  • Firstpage
    616
  • Lastpage
    620
  • Abstract
    This paper presents an extension of the two-stage transportation planning problem for a large scale hydropower construction project where bi-level programming and a balance of the satisfactory degree between decision makers are considered. For solving the complex and non-linear bilevel programming model, an interactive fuzzy programming technique and a particle swarm optimization with passive congregation algorithm are designed as a combined solution approach. Finally, the results and analysis of a practical example are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.
  • Keywords
    construction industry; decision making; fuzzy set theory; hydroelectric power; nonlinear programming; particle swarm optimisation; planning; project management; transportation; bi-level programming; complex bilevel programming model; decision makers; interactive fuzzy programming technique; large scale hydropower construction project; nonlinear bilevel programming model; particle swarm optimization; passive congregation algorithm; satisfactory degree; two-stage transportation planning problem; Companies; Linear programming; Materials; Planning; Programming profession; Transportation; bi-level programming; interactive fuzzy programming; particle swarm optimization; two-stage transportation planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational Sciences and Optimization (CSO), 2014 Seventh International Joint Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4799-5371-4
  • Type

    conf

  • DOI
    10.1109/CSO.2014.127
  • Filename
    6923760