Title :
Design Features for High Peak-Load Availability in Cogeneration Plants
Author_Institution :
Bechtel Western Power Corporation, P.O. Box 3965, San Francisco, CA 94119.
fDate :
7/1/1987 12:00:00 AM
Abstract :
High availability during periods of utility peak loads can be important to a cogeneration plant. Design features supporting high availability in both conventional steam-electric and gas-turbine-based cogeneration plants are described.
Keywords :
Availability; Cogeneration; Energy measurement; Industry Applications Society; Power generation; Power generation economics; Power industry; Power measurement; Productivity; Turbines;
Journal_Title :
Industry Applications, IEEE Transactions on
DOI :
10.1109/TIA.1987.4504975