• DocumentCode
    1203997
  • Title

    Choosing a SCADA System with the Operator in Mind

  • Author

    Osborne, William H.

  • Author_Institution
    Shell Oil Company, P. O. Box 2099, Houston, TX 77252-2099.
  • Issue
    6
  • fYear
    1987
  • Firstpage
    1073
  • Lastpage
    1076
  • Abstract
    Scan and data acquisition (SCADA) hardware and software are constantly changing. Because of these changes the SCADA keyboards, displays, and response time of today differ from the equipment performance of yesterday, and the equipment of the future will differ from the equipment of today. A review of pipeline control changes over the past 35 years is used to demonstrate how the equipment has served the operator. A brief discussion of new hardware developments shows how past experience might be applicable when designing SCADA systems in the future.
  • Keywords
    Centralized control; Communication system control; Control systems; Delay; Displays; Ergonomics; Hardware; Petroleum; Pipelines; SCADA systems;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/TIA.1987.4505033
  • Filename
    4505033