• DocumentCode
    1206954
  • Title

    System Development Planning via System Maturity Optimization

  • Author

    Ramirez-Marquez, Jose Emmanuel ; Sauser, Brian J.

  • Author_Institution
    Sch. of Syst. & Enterprises, Stevens Inst. of Technol., Hoboken, NJ, USA
  • Volume
    56
  • Issue
    3
  • fYear
    2009
  • Firstpage
    533
  • Lastpage
    548
  • Abstract
    Many U.S. government agencies and their contractors have subscribed to using the prescriptive metric of technology readiness level (TRL) as a measure of maturity of an individual technology, with a view toward operational use in a system context. A comprehensive set of concerns becomes relevant when this metric is abstracted from an individual technology to a system context, which may involve interplay among multiple technologies that are integrated through a system development life cycle. This paper proposes a system-focused approach for managing system development and making effective and efficient decisions during this life cycle. A system readiness level (SRL) index that incorporates both the current TRL scale and the concept of an integration readiness level is presented with methods for determining current and future readiness of a system. Using techniques in evolutionary algorithms, the SRL index is optimized based on resource allocation to provide a decision support approach that enhances managerial capabilities in the system´s development life cycle. The optimization model for the SRL is then executed with a case example and resource constraints of 75%, 60%, 45%, 30%, and 15% to demonstrate how it can be used to make strategic planning decisions in the system´s development life cycle.
  • Keywords
    planning; project management; research and development management; evolutionary algorithms; resource allocation; system development life cycle; system development planning; system maturity optimization; system readiness level; technology readiness level; Constraint optimization; Design engineering; Engineering management; Evolutionary computation; Government; Maintenance engineering; Project management; Resource management; Strategic planning; Technology management; Integration readiness level; project monitoring and control; project planning; system readiness level; technology management; technology readiness level;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/TEM.2009.2013830
  • Filename
    4806066