DocumentCode :
1207034
Title :
Evaluation of the impact of a large cyclic load on the LILCO power system using time simulation and frequency domain techniques
Author :
Rostamkolai, N. ; Piwko, R.J. ; Matusik, A.S.
Author_Institution :
Power Syst. Eng. Dept., GE Ind. Power Syst., Schenectady, NY, USA
Volume :
9
Issue :
3
fYear :
1994
fDate :
8/1/1994 12:00:00 AM
Firstpage :
1411
Lastpage :
1416
Abstract :
This paper describes a time and frequency domain approach for evaluation of impact of a large cyclic load on the Long Island Lighting Company (LILCO) power system. The frequency of the cyclic load had a range of 0.3 to 7.5 Hz, with peak-to-peak power variation as large as 20 MW. The frequency domain analysis revealed system resonances which are responsible for large responses in cases where the frequency of the cyclic load coincided with the resonant frequencies
Keywords :
digital simulation; frequency-domain analysis; load (electric); power system analysis computing; power system harmonics; resonance; 0.3 to 7.5 Hz; LILCO power system; Long Island Lighting Company; cyclic load; dynamic oscillations; frequency domain technique; harmonic distortion; peak-to-peak power variation; system resonances; time simulation; torsional stress; voltage fluctuations; Frequency domain analysis; Harmonic distortion; Industrial power systems; Laboratories; Modeling; Power engineering and energy; Power system simulation; Senior members; Synchrotrons; Voltage fluctuations;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.336123
Filename :
336123
Link To Document :
بازگشت