DocumentCode
1207250
Title
Transmission rights and transmission expansions
Author
Gribik, Paul R. ; Shirmohammadi, Dariush ; Graves, Joseph S. ; Kritikson, James G.
Author_Institution
PA Consulting Group, Washington, DC, USA
Volume
20
Issue
4
fYear
2005
Firstpage
1728
Lastpage
1737
Abstract
In this paper, we propose a new method of defining rights that may be assigned to the developer of a transmission expansion project. They include a right to collect the value of the capacity provided by the expansion project as well as the value arising from the admittance of the expansion project. This approach not only ties the rights allocation to actual physical characteristics of the transmission project but also allows such allocation to remain independent both of the order in which the projects are treated and of any previously allocated transmission rights.
Keywords
financial management; load flow; power markets; power transmission economics; power transmission planning; auction revenue right; financial flowgate right; financial transmission right; independent system operator; optimal power flow; regional transmission organization; transmission expansions project; Admittance; Electricity supply industry; ISO standards; Load flow; Pricing; Auction revenue right (ARR); financial flowgate right; financial transmission right (FTR); independent system operator (ISO); optimal power flow; regional transmission organization (RTO); transmission expansion;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/TPWRS.2005.851919
Filename
1525101
Link To Document