During the system test phase, "thorough testing" can pass the limits of practicality. Test case selection, based on simple priority rules, is one solution to the problem of practicality vs. thoroughness.
Keywords :
Application software; Central office; Centralized control; Control systems; Manuals; Size measurement; Software testing; System testing;