DocumentCode
120963
Title
Improving the accuracy of CBSD effort estimation using fuzzy logic
Author
Patil, Lalit V. ; Shivale, Nitin M. ; Joshi, S.D. ; Khanna, Vineet
Author_Institution
Bharath Univ., Chennai, India
fYear
2014
fDate
21-22 Feb. 2014
Firstpage
1385
Lastpage
1391
Abstract
One of the most important issues in effort estimation is accuracy of size measure methods, because accuracy of estimation depends upon the accurate prediction of size. Prediction of size is depends upon project data,Most of the time in initial stages project data is imperfect and ambiguous this leads to imprecision in its output thereby resulting in erroneous effort estimation using Constructive Cost Model (COCOMO-II) Model. Today´s software development is component based and that makes effort estimation process difficult due to the black box nature of component. Also traditional method does not support the component based software development effort estimation. Now the method which support accurate size prediction in component based software development is too much important for accurate effort estimation. Fuzzy logic based cost estimation model address the imperfect and ambiguousness present in Constructive Cost Model (COCOMO-II) models to make reliable and accurate estimation of effort. Component point method supports the accurate size prediction for component based software development which leads to accurate effort estimation in CBSD. The first aim of this paper is to show with comparisons the importance of size measure methods for accurate effort estimation. Paper shows component point is the best method for accurate size prediction in component black box nature. The second aim of this paper is to analyze the use of fuzzy logic in COCOMO-II model to address the imprecision present in its input and suggested four new cost drivers to improve the accuracy of effort estimation.
Keywords
fuzzy logic; object-oriented programming; software cost estimation; CBSD effort estimation; COCOMO-II; component based software development; component point method; constructive cost model; cost estimation model; fuzzy logic; size measure method; Accuracy; Complexity theory; Estimation; Fuzzy logic; Mathematical model; Size measurement; Software; Component Based Software Development (CBSD); Component Point (CP); Effort Estimation; Function Point (FP); Fuzzy Logic (FL);
fLanguage
English
Publisher
ieee
Conference_Titel
Advance Computing Conference (IACC), 2014 IEEE International
Conference_Location
Gurgaon
Print_ISBN
978-1-4799-2571-1
Type
conf
DOI
10.1109/IAdCC.2014.6779529
Filename
6779529
Link To Document