DocumentCode :
1210614
Title :
Implementation of a medium-scale CHP scheme
Author :
Burdon, I.P.
Author_Institution :
Merz and McLellan, Newcastle upon Tyne, UK
Volume :
8
Issue :
6
fYear :
1994
Firstpage :
265
Lastpage :
271
Abstract :
A typical medium-scale CHP project of about 50 MWe capacity, located on an industrial site which has a large heat and electricity load, is considered from a commercial and contractual standpoint. The essential elements of the scheme are identified and the role of the various parties who will need to become involved in the implementation and future operation of the scheme are discussed.<>
Keywords :
cogeneration; contracts; 50 MW; commercial aspects; contractual relationships; electricity load; fuel supply; funding; heat load; industrial site; maintenance; medium-scale CHP scheme; offtake contract; operation; project management; Cogeneration; Contracts;
fLanguage :
English
Journal_Title :
Power Engineering Journal
Publisher :
iet
ISSN :
0950-3366
Type :
jour
DOI :
10.1049/pe:19940603
Filename :
338435
Link To Document :
بازگشت