DocumentCode :
1211563
Title :
Accelerated trip scheme for second-zone distance protection
Author :
Sidhu, T.S. ; Ye, P. ; Sachdev, M.S.
Author_Institution :
Univ. of Western Ontario, Ont., Canada
Volume :
150
Issue :
3
fYear :
2003
fDate :
5/13/2003 12:00:00 AM
Firstpage :
325
Lastpage :
333
Abstract :
The theoretical aspects, design and testing of a new accelerated trip scheme for second-zone distance protection of HV/EHV transmission lines is described. The scheme is simple and provides relatively high-speed (60-70 ms) operation of the second-zone distance protection without requiring a communication channel. The scheme has been extensively tested using EMTDC simulations under various power system operating conditions. Simulation results show that the selectivity and speed of the proposed scheme are satisfactory for practical use in HV/EHV transmission line distance relays.
Keywords :
EMTP; digital simulation; power system simulation; power transmission lines; power transmission protection; relay protection; EMTDC simulations; HV/EHV transmission lines; accelerated trip scheme; distance protection selectivity; distance protection speed; distance relays; high-speed operation; power system operating conditions; second-zone distance protection;
fLanguage :
English
Journal_Title :
Generation, Transmission and Distribution, IEE Proceedings-
Publisher :
iet
ISSN :
1350-2360
Type :
jour
DOI :
10.1049/ip-gtd:20030197
Filename :
1201852
Link To Document :
بازگشت