DocumentCode :
1214554
Title :
Description of the Main Features of the Series Production of the LHC Main Dipole Magnets
Author :
Savary, F. ; Bajko, M. ; Chevret, P. ; de Rijk, G. ; Fessia, P. ; Lienard, P. ; Miles, J. ; Modena, M. ; Rossi, L. ; Tommasini, D. ; Vlogaert, J. ; Bresson, D. ; Grunblatt, G. ; Decoene, J.-F. ; Bressani, F. ; Drago, G. ; Gagliardi, P. ; Eysselein, F. ; G
Author_Institution :
AT Dept. of CERN, Eur. Lab. for Particle Phys., Geneva
Volume :
18
Issue :
2
fYear :
2008
fDate :
6/1/2008 12:00:00 AM
Firstpage :
220
Lastpage :
225
Abstract :
The series production of the LHC main dipole magnets was completed in November 2006. This paper presents the organization implemented at CERN and the milestones fixed to fulfill the technical requirements and to respect the master schedule of the machine installation. The CERN organization for the production follow-up, the quality assurance and the magnet testing, as well as the organization of the three main contractors will be described. A description of the design work and procurement of most of the specific heavy tooling and key components will be given with emphasis on the advantages and drawbacks.
Keywords :
accelerator magnets; cryogenics; quality assurance; superconducting magnets; CERN; LHC main dipole magnets; heavy tooling; machine installation; magnet testing; quality assurance; superconducting magnets; LHC; quality assurance; series production of superconducting magnets; superconducting magnets;
fLanguage :
English
Journal_Title :
Applied Superconductivity, IEEE Transactions on
Publisher :
ieee
ISSN :
1051-8223
Type :
jour
DOI :
10.1109/TASC.2008.920632
Filename :
4515945
Link To Document :
بازگشت